Please Sign Petition → SAIL Medical College at Rourkela & Upgrading IGH to Super Speciality Hospital
 
Upcoming Events
 

Do you think Hemanand Biswal can bring ESIC MC&H to RKL ?
View Results
ARCHIVE
April 2014
M T W T F S S
« Mar    
 123456
78910111213
14151617181920
21222324252627
282930  

Shell Erection of RSP’S Blast Furnace – 5 Commences

Date : March 18th, 2010
Share : | More

The Blast Furnace -5 shell erection was inaugurated by Mr. S.N. Singh, Managing Director, RSP. The first BF shell was lifted to position before the Managing Director and a number of senior officers and employees. The shell erection marks the beginning of another phase in the construction of the fifth blast furnace at RSP. It may be noted that the Civil Work for Blast Furnace – 5 started on 14th January, 2009 while the Blast Furnace foundation and civil work for its peripheral Wall was completed on 10th March, 2010.

The new blast furnace will have 4060 meter cube of Useful Volume with an average production capacity of 7924 Tons/day. The annual production capacity of this furnace will be 2.8MT/year which will increase the existing capacity of Hot Metal production to 4.5 MT/year. The furnace equipped with modern features such as Pulverized Coal Injection System, Cast House Fume Extraction System, Cast House Slag Granulation System, Top Gas recovery Turbine of 124 MW capacity, Twin Material Bin BLT system, Torpedo Ladle Cars of Capacity 350 Tons each, Waste Heat Recovery System, Plate, Stave Coolers, Conveyor Belt Charging System, one twin strand Pig Casting Machine of 1500 TPD. Besides, the furnace will operate on Level-II Automation and coke rate with a minimum level of 360 kg/Ton of Hot Metal. All the Executive Directors, senior officers of projects department and Blast Furnaces were present on the occasion. It is noteworthy that the erection is being supervised by foreign expert from M/s Danielli Corus along with experts from M/s Tata Projects Limited while MECON is providing Designer’s supervision.

 

Leave a Reply

What Readers Say ?
  • we are alredy doing campgnn against sarda nayak and esicmch :) :)
    situn | More
  • we should campgn for dilip ray in facebook please support us
    situn | More
  • I have just one question to Mr CM..Why on earth we need 3 govt medical colleges at one place ? ...
    alok | More
  • I luv hockey i
    haresh kumar | More
  • @ biswa sarda nayak pyari babu chori karne ke baad bas ek statement dekar 9 tanki kaar raha hai,kuch fayda nain ...
    situn | More
Back to Top
POWERED AT
Join us at
  • facebook
  • twitter
  • Myspace
  • Digg